SR 836 WB over NW 29th Avenue
GoodMiami-Dade County, Florida · 0.15 Mi. W of NW 27th Ave · Structure no. 870141
- Built
- 1968
- 57 years old, rebuilt 2019
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 144 ft
- 3 main spans
- Daily traffic
- 192,500
- 2021 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR 836 WB over NW 29th Avenue is a prestressed concrete stringer/multi-beam or girder carrying SR 836 WB over NW 29th Avenue in Miami-Dade County, Florida. It was built in 1968 and reconstructed in 2019, so it is 57 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 192,500 vehicles a day, roughly 4% of them trucks, projected to reach 221,500 by 2042. The structure is 144 ft (43.9 m) long and 108 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 836 WB over NW 29th Avenue built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2019.
What condition is SR 836 WB over NW 29th Avenue in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does SR 836 WB over NW 29th Avenue carry?
About 192,500 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is SR 836 WB over NW 29th Avenue?
The structure is 144 ft (43.9 m) long with a longest span of 73 ft (22.4 m) and a deck 108 ft wide.
Who owns SR 836 WB over NW 29th Avenue?
It is owned by the State Toll Authority.