US Bridges

SR-826 SB (870287) over SW 72nd ST (sunset Dr)

Good

Miami-Dade County, Florida · SR-826 & SW 72nd ST · Structure no. 870132

Built
1961
64 years old, rebuilt 1997
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
167 ft
3 main spans
Daily traffic
50,500
2022 count
Owner
State
State Highway Agency

About this bridge

SR-826 SB (870287) over SW 72nd ST (sunset Dr) is a prestressed concrete stringer/multi-beam or girder carrying SR-826 SB (870287) over SW 72nd ST (sunset Dr) in Miami-Dade County, Florida. It was built in 1961 and reconstructed in 1997, so it is 64 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,500 vehicles a day, roughly 4% of them trucks, projected to reach 87,618 by 2044. The structure is 167 ft (50.9 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-826 SB (870287)
CrossesSW 72nd ST (sunset Dr)
LocationSR-826 & SW 72nd ST
RouteState Highway 826
StateFlorida
Coordinates25.70301, -80.31756
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.4 US tons
Inventory rating38.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length167 ft (50.9 m)
Longest span90 ft (27.4 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,500 (2022)
Projected traffic87,618 by 2044
Trucks4%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-826 SB (870287) over SW 72nd ST (sunset Dr) built?

It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1997.

What condition is SR-826 SB (870287) over SW 72nd ST (sunset Dr) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR-826 SB (870287) over SW 72nd ST (sunset Dr) carry?

About 50,500 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is SR-826 SB (870287) over SW 72nd ST (sunset Dr)?

The structure is 167 ft (50.9 m) long with a longest span of 90 ft (27.4 m) and a deck 59 ft wide.

Who owns SR-826 SB (870287) over SW 72nd ST (sunset Dr)?

It is owned by the State Highway Agency.