US Bridges

SR 112 WB over NW 37th Avenue

Good

Miami-Dade County, Florida · 0.2 Mile E of SR 953 Exit · Structure no. 870122

Built
1960
65 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
157 ft
3 main spans
Daily traffic
55,500
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 112 WB over NW 37th Avenue is a prestressed concrete stringer/multi-beam or girder carrying SR 112 WB over NW 37th Avenue in Miami-Dade County, Florida. It was built in 1960, so it is 65 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55,500 vehicles a day, roughly 6% of them trucks, projected to reach 96,292 by 2044. The structure is 157 ft (48 m) long and 75 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 112 WB
CrossesNW 37th Avenue
Location0.2 Mile E of SR 953 Exit
RouteState Highway 112
StateFlorida
Coordinates25.8105, -80.25656
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating34.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length157 ft (48 m)
Longest span67 ft (20.5 m)
Deck width75 ft (22.9 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55,500 (2022)
Projected traffic96,292 by 2044
Trucks6%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 112 WB over NW 37th Avenue built?

It was built in 1960, making it 65 years old in 2025.

What condition is SR 112 WB over NW 37th Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR 112 WB over NW 37th Avenue carry?

About 55,500 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR 112 WB over NW 37th Avenue?

The structure is 157 ft (48 m) long with a longest span of 67 ft (20.5 m) and a deck 75 ft wide.

Who owns SR 112 WB over NW 37th Avenue?

It is owned by the State Toll Authority.