US Bridges

Ramp SR-907 over SR-907 & 5 & 6 Streets

Fair

Miami-Dade County, Florida · Flyover at 5 ST Mia Beach · Structure no. 870099

Built
1958
67 years old
Condition
Fair
inspected July 2024
Type
Slab
Concrete
Length
733 ft
18 main spans
Daily traffic
14,500
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp SR-907 over SR-907 & 5 & 6 Streets is a concrete slab carrying Ramp SR-907 over SR-907 & 5 & 6 Streets in Miami-Dade County, Florida. It was built in 1958, so it is 67 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,500 vehicles a day, roughly 15% of them trucks, projected to reach 24,290 by 2044. The structure is 733 ft (223.4 m) long and 20 ft wide.

CarriesRamp SR-907
CrossesSR-907 & 5 & 6 Streets
LocationFlyover at 5 ST Mia Beach
RouteState Highway 907
StateFlorida
Coordinates25.77472, -80.14079
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating69.9 US tons
Inventory rating41.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans18
Design loadHS 20
Structure length733 ft (223.4 m)
Longest span62 ft (18.9 m)
Deck width20 ft (6.1 m)
Roadway width17 ft (5.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,500 (2024)
Projected traffic24,290 by 2044
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$767,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp SR-907 over SR-907 & 5 & 6 Streets built?

It was built in 1958, making it 67 years old in 2025.

What condition is Ramp SR-907 over SR-907 & 5 & 6 Streets in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Ramp SR-907 over SR-907 & 5 & 6 Streets carry?

About 14,500 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is Ramp SR-907 over SR-907 & 5 & 6 Streets?

The structure is 733 ft (223.4 m) long with a longest span of 62 ft (18.9 m) and a deck 20 ft wide.

Who owns Ramp SR-907 over SR-907 & 5 & 6 Streets?

It is owned by the State Highway Agency.