SR-5 SB (870228) over Mowry Canal C-103
GoodMiami-Dade County, Florida · 0.11M N of SW 296 ST · Structure no. 870010
- Built
- 1966
- 59 years old, rebuilt 2012
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 63 ft
- 3 main spans
- Daily traffic
- 14,250
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-5 SB (870228) over Mowry Canal C-103 is a concrete slab carrying SR-5 SB (870228) over Mowry Canal C-103 in Miami-Dade County, Florida. It was built in 1966 and reconstructed in 2012, so it is 59 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,250 vehicles a day, roughly 6% of them trucks, projected to reach 24,724 by 2044. The structure is 63 ft (19.2 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-5 SB (870228) over Mowry Canal C-103 built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2012.
What condition is SR-5 SB (870228) over Mowry Canal C-103 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SR-5 SB (870228) over Mowry Canal C-103 carry?
About 14,250 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR-5 SB (870228) over Mowry Canal C-103?
The structure is 63 ft (19.2 m) long with a longest span of 21 ft (6.4 m) and a deck 51 ft wide.
Who owns SR-5 SB (870228) over Mowry Canal C-103?
It is owned by the State Highway Agency.