SB I-95 (sr 9) over Drainage Canal
GoodMartin County, Florida · 1 Mi. N of Cnty RD 708 · Structure no. 890131
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected February 2025
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 51,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SB I-95 (sr 9) over Drainage Canal is a concrete continuous slab carrying SB I-95 (sr 9) over Drainage Canal in Martin County, Florida. It was built in 1986, so it is 39 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 51,500 vehicles a day, roughly 11% of them trucks, projected to reach 89,352 by 2044. The structure is 80 ft (24.4 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SB I-95 (sr 9) over Drainage Canal built?
It was built in 1986, making it 39 years old in 2025.
What condition is SB I-95 (sr 9) over Drainage Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does SB I-95 (sr 9) over Drainage Canal carry?
About 51,500 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is SB I-95 (sr 9) over Drainage Canal?
The structure is 80 ft (24.4 m) long with a longest span of 27 ft (8.1 m) and a deck 59 ft wide.
Who owns SB I-95 (sr 9) over Drainage Canal?
It is owned by the State Highway Agency.