US-1 (SR-5) NB over Fec Rr(olympia Overpass)
FairMartin County, Florida · 1 Mile South of CR-708 · Structure no. 890021
- Built
- 1956
- 69 years old, rebuilt 2002
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 196 ft
- 5 main spans
- Daily traffic
- 10,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US-1 (SR-5) NB over Fec Rr(olympia Overpass) is a steel stringer/multi-beam or girder carrying US-1 (SR-5) NB over Fec Rr(olympia Overpass) in Martin County, Florida. It was built in 1956 and reconstructed in 2002, so it is 69 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,000 vehicles a day, roughly 8% of them trucks, projected to reach 17,350 by 2044. The structure is 196 ft (59.7 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-1 (SR-5) NB over Fec Rr(olympia Overpass) built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2002.
What condition is US-1 (SR-5) NB over Fec Rr(olympia Overpass) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does US-1 (SR-5) NB over Fec Rr(olympia Overpass) carry?
About 10,000 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is US-1 (SR-5) NB over Fec Rr(olympia Overpass)?
The structure is 196 ft (59.7 m) long with a longest span of 56 ft (17.1 m) and a deck 39 ft wide.
Who owns US-1 (SR-5) NB over Fec Rr(olympia Overpass)?
It is owned by the State Highway Agency.