US Bridges

I-75 Gen Use Lanes over Manatee River

Good

Manatee County, Florida · Over Manatee River · Structure no. 130157

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
3,391 ft
23 main spans
Daily traffic
13,300
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 Gen Use Lanes over Manatee River is a prestressed concrete stringer/multi-beam or girder carrying I-75 Gen Use Lanes over Manatee River in Manatee County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,300 vehicles a day, projected to reach 22,100 by 2044. The structure is 3,391 ft (1,033.6 m) long and 59 ft wide.

CarriesI-75 Gen Use Lanes
CrossesManatee River
LocationOver Manatee River
RouteInterstate 75
StateFlorida
Coordinates27.52523, -82.50689
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.6 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans23
Design loadHL 93
Structure length3,391 ft (1,033.6 m)
Longest span159 ft (48.6 m)
Deck width59 ft (17.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,300 (2024)
Projected traffic22,100 by 2044
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 Gen Use Lanes over Manatee River built?

It was built in 2024, making it 1 years old in 2025.

What condition is I-75 Gen Use Lanes over Manatee River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-75 Gen Use Lanes over Manatee River carry?

About 13,300 vehicles per day (2024 count).

How long is I-75 Gen Use Lanes over Manatee River?

The structure is 3,391 ft (1,033.6 m) long with a longest span of 159 ft (48.6 m) and a deck 59 ft wide.

Who owns I-75 Gen Use Lanes over Manatee River?

It is owned by the State Highway Agency.