I-75 Gen Use Lanes over Manatee River
GoodManatee County, Florida · Over Manatee River · Structure no. 130157
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,391 ft
- 23 main spans
- Daily traffic
- 13,300
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 Gen Use Lanes over Manatee River is a prestressed concrete stringer/multi-beam or girder carrying I-75 Gen Use Lanes over Manatee River in Manatee County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,300 vehicles a day, projected to reach 22,100 by 2044. The structure is 3,391 ft (1,033.6 m) long and 59 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 Gen Use Lanes over Manatee River built?
It was built in 2024, making it 1 years old in 2025.
What condition is I-75 Gen Use Lanes over Manatee River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does I-75 Gen Use Lanes over Manatee River carry?
About 13,300 vehicles per day (2024 count).
How long is I-75 Gen Use Lanes over Manatee River?
The structure is 3,391 ft (1,033.6 m) long with a longest span of 159 ft (48.6 m) and a deck 59 ft wide.
Who owns I-75 Gen Use Lanes over Manatee River?
It is owned by the State Highway Agency.