US Bridges

I-275 NB over Terra Ceia River

Fair

Manatee County, Florida · 1.2MI. West of US-41 · Structure no. 130129

Built
1984
41 years old
Condition
Fair
inspected August 2024
Type
Slab
Prestressed Concrete
Length
1,820 ft
52 main spans
Daily traffic
51,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-275 NB over Terra Ceia River is a prestressed concrete slab carrying I-275 NB over Terra Ceia River in Manatee County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 51,000 vehicles a day, roughly 7% of them trucks, projected to reach 88,485 by 2044. The structure is 1,820 ft (554.7 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-275 NB
CrossesTerra Ceia River
Location1.2MI. West of US-41
RouteInterstate 275
StateFlorida
Coordinates27.58204, -82.56321
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating45.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans52
Design loadHS 20 + Mod
Structure length1,820 ft (554.7 m)
Longest span35 ft (10.7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51,000 (2024)
Projected traffic88,485 by 2044
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-275 NB over Terra Ceia River built?

It was built in 1984, making it 41 years old in 2025.

What condition is I-275 NB over Terra Ceia River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-275 NB over Terra Ceia River carry?

About 51,000 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is I-275 NB over Terra Ceia River?

The structure is 1,820 ft (554.7 m) long with a longest span of 35 ft (10.7 m) and a deck 43 ft wide.

Who owns I-275 NB over Terra Ceia River?

It is owned by the State Highway Agency.