I-75 (SR-93) SB over Foley Creek
GoodManatee County, Florida · 3.5 MI S of SR-70 · Structure no. 130070
- Built
- 1979
- 46 years old, rebuilt 2016
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 190 ft
- 4 main spans
- Daily traffic
- 70,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 (SR-93) SB over Foley Creek is a prestressed concrete stringer/multi-beam or girder carrying I-75 (SR-93) SB over Foley Creek in Manatee County, Florida. It was built in 1979 and reconstructed in 2016, so it is 46 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 70,000 vehicles a day, roughly 13% of them trucks, projected to reach 121,450 by 2042. The structure is 190 ft (57.9 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 (SR-93) SB over Foley Creek built?
It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2016.
What condition is I-75 (SR-93) SB over Foley Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does I-75 (SR-93) SB over Foley Creek carry?
About 70,000 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is I-75 (SR-93) SB over Foley Creek?
The structure is 190 ft (57.9 m) long with a longest span of 48 ft (14.6 m) and a deck 71 ft wide.
Who owns I-75 (SR-93) SB over Foley Creek?
It is owned by the State Highway Agency.