SR20 over Telogia Creek Relief
GoodLiberty County, Florida · 8.4 MI W of SR65 · Structure no. 560060
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected September 2023
- Type
- Slab
- Concrete Continuous
- Length
- 167 ft
- 6 main spans
- Daily traffic
- 4,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR20 over Telogia Creek Relief is a concrete continuous slab carrying SR20 over Telogia Creek Relief in Liberty County, Florida. It was built in 1990, so it is 35 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,500 vehicles a day, roughly 17% of them trucks, projected to reach 7,808 by 2044. The structure is 167 ft (50.9 m) long and 47 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR20 over Telogia Creek Relief built?
It was built in 1990, making it 35 years old in 2025.
What condition is SR20 over Telogia Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SR20 over Telogia Creek Relief carry?
About 4,500 vehicles per day (2022 count), of which roughly 17% are trucks.
How long is SR20 over Telogia Creek Relief?
The structure is 167 ft (50.9 m) long with a longest span of 29 ft (8.8 m) and a deck 47 ft wide.
Who owns SR20 over Telogia Creek Relief?
It is owned by the State Highway Agency.