US Bridges

CR 155 over Drainage Ditch

Good

Leon County, Florida · 0.5 MI North of I-10 · Structure no. 555185

Built
2021
4 years old
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
12,200
2021 count
Owner
County
County Highway Agency

About this bridge

CR 155 over Drainage Ditch is a concrete culvert carrying CR 155 over Drainage Ditch in Leon County, Florida. It was built in 2021, so it is 4 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,200 vehicles a day, roughly 3% of them trucks, projected to reach 13,420 by 2041. The structure is 32 ft (9.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 155
CrossesDrainage Ditch
Location0.5 MI North of I-10
RouteCounty Highway 0
StateFlorida
Coordinates30.5001, -84.27735
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating38 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length32 ft (9.9 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,200 (2021)
Projected traffic13,420 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 155 over Drainage Ditch built?

It was built in 2021, making it 4 years old in 2025.

What condition is CR 155 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does CR 155 over Drainage Ditch carry?

About 12,200 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is CR 155 over Drainage Ditch?

The structure is 32 ft (9.9 m) long with a longest span of 10 ft (3 m).

Who owns CR 155 over Drainage Ditch?

It is owned by the County Highway Agency.