Blair Stone Parkwy over CSX RR
GoodLeon County, Florida · 0.5 Miles S of US90/SR10 · Structure no. 555156
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,069 ft
- 8 main spans
- Daily traffic
- 18,300
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Blair Stone Parkwy over CSX RR is a prestressed concrete stringer/multi-beam or girder carrying Blair Stone Parkwy over CSX RR in Leon County, Florida. It was built in 2003, so it is 22 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,300 vehicles a day, roughly 3% of them trucks, projected to reach 20,130 by 2043. The structure is 1,069 ft (325.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Blair Stone Parkwy over CSX RR built?
It was built in 2003, making it 22 years old in 2025.
What condition is Blair Stone Parkwy over CSX RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Blair Stone Parkwy over CSX RR carry?
About 18,300 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Blair Stone Parkwy over CSX RR?
The structure is 1,069 ft (325.8 m) long with a longest span of 140 ft (42.6 m) and a deck 43 ft wide.
Who owns Blair Stone Parkwy over CSX RR?
It is owned by the City or Municipal Highway Agency.