US Bridges

Meridian Street over Drainage Ditch

Fair

Leon County, Florida · 0.39 MI South of SR 265 · Structure no. 555128

Built
1994
31 years old
Condition
Fair
inspected November 2023
Type
Channel Beam
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
1,650
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Meridian Street over Drainage Ditch is a prestressed concrete channel beam carrying Meridian Street over Drainage Ditch in Leon County, Florida. It was built in 1994, so it is 31 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,650 vehicles a day, roughly 1% of them trucks, projected to reach 1,815 by 2042. The structure is 60 ft (18.2 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMeridian Street
CrossesDrainage Ditch
Location0.39 MI South of SR 265
RouteCity Street 0
StateFlorida
Coordinates30.41425, -84.27711
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating39 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length60 ft (18.2 m)
Longest span60 ft (18.2 m)
Deck width58 ft (17.6 m)
Roadway width55 ft (16.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,650 (2022)
Projected traffic1,815 by 2042
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Meridian Street over Drainage Ditch built?

It was built in 1994, making it 31 years old in 2025.

What condition is Meridian Street over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Meridian Street over Drainage Ditch carry?

About 1,650 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Meridian Street over Drainage Ditch?

The structure is 60 ft (18.2 m) long with a longest span of 60 ft (18.2 m) and a deck 58 ft wide.

Who owns Meridian Street over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.