US Bridges

Tram Road over Willow Swamp

Good

Leon County, Florida · 9.29 Miles East of US 319 · Structure no. 554189

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
28 ft
3 main spans
Daily traffic
3,700
2022 count
Owner
County
County Highway Agency

About this bridge

Tram Road over Willow Swamp is a concrete culvert carrying Tram Road over Willow Swamp in Leon County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,700 vehicles a day, projected to reach 4,070 by 2042. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTram Road
CrossesWillow Swamp
Location9.29 Miles East of US 319
RouteCounty Highway 0
StateFlorida
Coordinates30.37012, -84.08321
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.8 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length28 ft (8.5 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,700 (2022)
Projected traffic4,070 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tram Road over Willow Swamp built?

It was built in 2023, making it 2 years old in 2025.

What condition is Tram Road over Willow Swamp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Tram Road over Willow Swamp carry?

About 3,700 vehicles per day (2022 count).

How long is Tram Road over Willow Swamp?

The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m).

Who owns Tram Road over Willow Swamp?

It is owned by the County Highway Agency.