Silver Lake Road over Unnamed Branch
FairLeon County, Florida · 1.8 Miles South of SR 20 · Structure no. 554027
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected August 2024
- Type
- Culvert
- Steel
- Length
- 23 ft
- 3 main spans
- Daily traffic
- 5,500
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Silver Lake Road over Unnamed Branch is a steel culvert carrying Silver Lake Road over Unnamed Branch in Leon County, Florida. It was built in 1970, so it is 55 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,500 vehicles a day, roughly 8% of them trucks, projected to reach 6,050 by 2043. The structure is 23 ft (6.9 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Silver Lake Road over Unnamed Branch built?
It was built in 1970, making it 55 years old in 2025.
What condition is Silver Lake Road over Unnamed Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Silver Lake Road over Unnamed Branch carry?
About 5,500 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Silver Lake Road over Unnamed Branch?
The structure is 23 ft (6.9 m) long with a longest span of 9 ft (2.6 m).
Who owns Silver Lake Road over Unnamed Branch?
It is owned by the County Highway Agency.