US Bridges

I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp

Good

Leon County, Florida · 450FT W of US319 · Structure no. 550154

Built
2008
17 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
156 ft
1 main span
Daily traffic
10,000
2022 count
Owner
State
State Highway Agency

About this bridge

I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp is a prestressed concrete stringer/multi-beam or girder carrying I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp in Leon County, Florida. It was built in 2008, so it is 17 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 6% of them trucks, projected to reach 17,350 by 2044. The structure is 156 ft (47.4 m) long and 43 ft wide.

CarriesI10 SR8 WB on Ramp
CrossesI10 SR8 WB Off Ramp
Location450FT W of US319
RouteInterstate 10
StateFlorida
Coordinates30.50225, -84.24979
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95 US tons
Inventory rating57 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length156 ft (47.4 m)
Longest span156 ft (47.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2022)
Projected traffic17,350 by 2044
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp built?

It was built in 2008, making it 17 years old in 2025.

What condition is I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp carry?

About 10,000 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp?

The structure is 156 ft (47.4 m) long with a longest span of 156 ft (47.4 m) and a deck 43 ft wide.

Who owns I10 SR8 WB on Ramp over I10 SR8 WB Off Ramp?

It is owned by the State Highway Agency.