US Bridges

SR61 US319 over Foshalee Slu

Good

Leon County, Florida · 2.2MI S. of Ga. Line · Structure no. 550144

Built
2000
25 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
50 ft
4 main spans
Daily traffic
6,259
2022 count
Owner
State
State Highway Agency

About this bridge

SR61 US319 over Foshalee Slu is a concrete culvert carrying SR61 US319 over Foshalee Slu in Leon County, Florida. It was built in 2000, so it is 25 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,259 vehicles a day, roughly 10% of them trucks, projected to reach 10,859 by 2044. The structure is 50 ft (15.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR61 US319
CrossesFoshalee Slu
Location2.2MI S. of Ga. Line
RouteU.S. Route 61
StateFlorida
Coordinates30.65001, -84.16842
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.2 US tons
Inventory rating27.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length50 ft (15.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,259 (2022)
Projected traffic10,859 by 2044
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR61 US319 over Foshalee Slu built?

It was built in 2000, making it 25 years old in 2025.

What condition is SR61 US319 over Foshalee Slu in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SR61 US319 over Foshalee Slu carry?

About 6,259 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is SR61 US319 over Foshalee Slu?

The structure is 50 ft (15.3 m) long with a longest span of 12 ft (3.7 m).

Who owns SR61 US319 over Foshalee Slu?

It is owned by the State Highway Agency.