US Bridges

SW 11th Ave. over Cormorant Canal

Good

Lee County, Florida · 0.1MI N of Veterans Pkwy · Structure no. 125680

Built
1975
50 years old
Condition
Good
inspected November 2023
Type
Slab
Prestressed Concrete
Length
25 ft
1 main span
Daily traffic
500
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

SW 11th Ave. over Cormorant Canal is a prestressed concrete slab carrying SW 11th Ave. over Cormorant Canal in Lee County, Florida. It was built in 1975, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 2% of them trucks, projected to reach 750 by 2041. The structure is 25 ft (7.6 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSW 11th Ave.
CrossesCormorant Canal
Location0.1MI N of Veterans Pkwy
RouteCity Street 0
StateFlorida
Coordinates26.60857, -81.997
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.7 US tons
Inventory rating44.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width37 ft (11.4 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2021)
Projected traffic750 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SW 11th Ave. over Cormorant Canal built?

It was built in 1975, making it 50 years old in 2025.

What condition is SW 11th Ave. over Cormorant Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SW 11th Ave. over Cormorant Canal carry?

About 500 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is SW 11th Ave. over Cormorant Canal?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m) and a deck 37 ft wide.

Who owns SW 11th Ave. over Cormorant Canal?

It is owned by the City or Municipal Highway Agency.