US Bridges

Connie Ave over Able Canal

Good

Lee County, Florida · 0.6MI N of 5th ST West · Structure no. 124929

Built
1992
33 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
129 ft
4 main spans
Daily traffic
225
2024 count
Owner
Local
Other Local Agency

About this bridge

Connie Ave over Able Canal is a concrete continuous slab carrying Connie Ave over Able Canal in Lee County, Florida. It was built in 1992, so it is 33 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 225 vehicles a day, roughly 1% of them trucks, projected to reach 281 by 2044. The structure is 129 ft (39.2 m) long and 40 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesConnie Ave
CrossesAble Canal
Location0.6MI N of 5th ST West
RouteCity Street 0
StateFlorida
Coordinates26.62491, -81.66509
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.4 US tons
Inventory rating43.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length129 ft (39.2 m)
Longest span32 ft (9.9 m)
Deck width40 ft (12.2 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic225 (2024)
Projected traffic281 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Connie Ave over Able Canal built?

It was built in 1992, making it 33 years old in 2025.

What condition is Connie Ave over Able Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Connie Ave over Able Canal carry?

About 225 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Connie Ave over Able Canal?

The structure is 129 ft (39.2 m) long with a longest span of 32 ft (9.9 m) and a deck 40 ft wide.

Who owns Connie Ave over Able Canal?

It is owned by the Other Local Agency.