US Bridges

Bell Blvd. over Nine Mile Canal

Good

Lee County, Florida · 0.25 MI S of CR-884 · Structure no. 124911

Built
1964
61 years old
Condition
Good
inspected July 2024
Type
Slab
Prestressed Concrete
Length
60 ft
3 main spans
Daily traffic
2,880
2024 count
Owner
Local
Other Local Agency

About this bridge

Bell Blvd. over Nine Mile Canal is a prestressed concrete slab carrying Bell Blvd. over Nine Mile Canal in Lee County, Florida. It was built in 1964, so it is 61 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,880 vehicles a day, roughly 10% of them trucks, projected to reach 3,460 by 2044. The structure is 60 ft (18.3 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBell Blvd.
CrossesNine Mile Canal
Location0.25 MI S of CR-884
RouteCity Street 0
StateFlorida
Coordinates26.60055, -81.60964
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.8 US tons
Inventory rating35.2 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span20 ft (6.1 m)
Deck width33 ft (10.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,880 (2024)
Projected traffic3,460 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bell Blvd. over Nine Mile Canal built?

It was built in 1964, making it 61 years old in 2025.

What condition is Bell Blvd. over Nine Mile Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Bell Blvd. over Nine Mile Canal carry?

About 2,880 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Bell Blvd. over Nine Mile Canal?

The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 33 ft wide.

Who owns Bell Blvd. over Nine Mile Canal?

It is owned by the Other Local Agency.