US Bridges

Summerlin RD/CR869 over College Parkway

Good

Lee County, Florida · 0.8 MI N/O Cypress Lk DR · Structure no. 124113

Built
2011
14 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
449 ft
3 main spans
Daily traffic
44,797
2023 count
Owner
County
County Highway Agency

About this bridge

Summerlin RD/CR869 over College Parkway is a steel continuous box beam or girders - single or spread carrying Summerlin RD/CR869 over College Parkway in Lee County, Florida. It was built in 2011, so it is 14 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 44,797 vehicles a day, roughly 2% of them trucks, projected to reach 55,996 by 2042. The structure is 449 ft (136.9 m) long and 81 ft wide.

CarriesSummerlin RD/CR869
CrossesCollege Parkway
Location0.8 MI N/O Cypress Lk DR
RouteCounty Highway 869
StateFlorida
Coordinates26.55693, -81.88532
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length449 ft (136.9 m)
Longest span218 ft (66.3 m)
Deck width81 ft (24.7 m)
Roadway width78 ft (23.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic44,797 (2023)
Projected traffic55,996 by 2042
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Summerlin RD/CR869 over College Parkway built?

It was built in 2011, making it 14 years old in 2025.

What condition is Summerlin RD/CR869 over College Parkway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Summerlin RD/CR869 over College Parkway carry?

About 44,797 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Summerlin RD/CR869 over College Parkway?

The structure is 449 ft (136.9 m) long with a longest span of 218 ft (66.3 m) and a deck 81 ft wide.

Who owns Summerlin RD/CR869 over College Parkway?

It is owned by the County Highway Agency.