US Bridges

I-75 SB (SR-93) over Alico RD

Good

Lee County, Florida · 9.9 MI S of SR-82 · Structure no. 120187

Built
2007
18 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
260 ft
2 main spans
Daily traffic
59,541
2022 count
Owner
State
State Highway Agency

About this bridge

I-75 SB (SR-93) over Alico RD is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93) over Alico RD in Lee County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59,541 vehicles a day, roughly 12% of them trucks, projected to reach 103,304 by 2044. The structure is 260 ft (79.2 m) long and 111 ft wide.

CarriesI-75 SB (SR-93)
CrossesAlico RD
Location9.9 MI S of SR-82
RouteInterstate 75
StateFlorida
Coordinates26.49291, -81.79459
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.8 US tons
Inventory rating37.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length260 ft (79.2 m)
Longest span135 ft (41.1 m)
Deck width111 ft (33.8 m)
Roadway width106 ft (32.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic59,541 (2022)
Projected traffic103,304 by 2044
Trucks12%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 SB (SR-93) over Alico RD built?

It was built in 2007, making it 18 years old in 2025.

What condition is I-75 SB (SR-93) over Alico RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-75 SB (SR-93) over Alico RD carry?

About 59,541 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is I-75 SB (SR-93) over Alico RD?

The structure is 260 ft (79.2 m) long with a longest span of 135 ft (41.1 m) and a deck 111 ft wide.

Who owns I-75 SB (SR-93) over Alico RD?

It is owned by the State Highway Agency.