US Bridges

Swfia Terminal Acc over Ben Hill Griffin Prky

Good

Lee County, Florida · 0.5 MI E of I-75 (SR-93) · Structure no. 120185

Built
2015
10 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
168 ft
1 main span
Daily traffic
27,500
2025 count
Owner
State
State Highway Agency

About this bridge

Swfia Terminal Acc over Ben Hill Griffin Prky is a prestressed concrete stringer/multi-beam or girder carrying Swfia Terminal Acc over Ben Hill Griffin Prky in Lee County, Florida. It was built in 2015, so it is 10 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 27,500 vehicles a day, roughly 9% of them trucks, projected to reach 34,375 by 2042. The structure is 168 ft (51.2 m) long and 94 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSwfia Terminal Acc
CrossesBen Hill Griffin Prky
Location0.5 MI E of I-75 (SR-93)
StateFlorida
Coordinates26.51181, -81.78547
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating43.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length168 ft (51.2 m)
Longest span168 ft (51.2 m)
Deck width94 ft (28.7 m)
Roadway width75 ft (22.9 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic27,500 (2025)
Projected traffic34,375 by 2042
Trucks9%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Swfia Terminal Acc over Ben Hill Griffin Prky built?

It was built in 2015, making it 10 years old in 2025.

What condition is Swfia Terminal Acc over Ben Hill Griffin Prky in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Swfia Terminal Acc over Ben Hill Griffin Prky carry?

About 27,500 vehicles per day (2025 count), of which roughly 9% are trucks.

How long is Swfia Terminal Acc over Ben Hill Griffin Prky?

The structure is 168 ft (51.2 m) long with a longest span of 168 ft (51.2 m) and a deck 94 ft wide.

Who owns Swfia Terminal Acc over Ben Hill Griffin Prky?

It is owned by the State Highway Agency.