SR-80(PALM Bch Bv) over Hickey Creek
GoodLee County, Florida · 5.7MI East of SR-31 · Structure no. 120159
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 161 ft
- 5 main spans
- Daily traffic
- 27,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-80(PALM Bch Bv) over Hickey Creek is a concrete continuous slab carrying SR-80(PALM Bch Bv) over Hickey Creek in Lee County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,000 vehicles a day, roughly 17% of them trucks, projected to reach 46,845 by 2042. The structure is 161 ft (49.2 m) long and 93 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-80(PALM Bch Bv) over Hickey Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is SR-80(PALM Bch Bv) over Hickey Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SR-80(PALM Bch Bv) over Hickey Creek carry?
About 27,000 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is SR-80(PALM Bch Bv) over Hickey Creek?
The structure is 161 ft (49.2 m) long with a longest span of 33 ft (10 m) and a deck 93 ft wide.
Who owns SR-80(PALM Bch Bv) over Hickey Creek?
It is owned by the State Highway Agency.