US Bridges

East Terry Street over I-75

Good

Lee County, Florida · 1 Mi. N of CR 865 · Structure no. 120145

Built
1981
44 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
261 ft
2 main spans
Daily traffic
11,100
2023 count
Owner
State
State Highway Agency

About this bridge

East Terry Street over I-75 is a prestressed concrete continuous stringer/multi-beam or girder carrying East Terry Street over I-75 in Lee County, Florida. It was built in 1981, so it is 44 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,100 vehicles a day, roughly 6% of them trucks, projected to reach 19,258 by 2042. The structure is 261 ft (79.6 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesEast Terry Street
CrossesI-75
Location1 Mi. N of CR 865
RouteCounty Highway 0
StateFlorida
Coordinates26.34589, -81.75333
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.4 US tons
Inventory rating40.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length261 ft (79.6 m)
Longest span131 ft (39.8 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,100 (2023)
Projected traffic19,258 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was East Terry Street over I-75 built?

It was built in 1981, making it 44 years old in 2025.

What condition is East Terry Street over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does East Terry Street over I-75 carry?

About 11,100 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is East Terry Street over I-75?

The structure is 261 ft (79.6 m) long with a longest span of 131 ft (39.8 m) and a deck 43 ft wide.

Who owns East Terry Street over I-75?

It is owned by the State Highway Agency.