I-75 SB (SR-93) over SR-876 (daniels Pkwy)
GoodLee County, Florida · 6.2 MI S/O SR-82 · Structure no. 120106
- Built
- 1979
- 46 years old, rebuilt 2010
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 4 main spans
- Daily traffic
- 59,541
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 SB (SR-93) over SR-876 (daniels Pkwy) is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93) over SR-876 (daniels Pkwy) in Lee County, Florida. It was built in 1979 and reconstructed in 2010, so it is 46 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 59,541 vehicles a day, roughly 12% of them trucks, projected to reach 103,304 by 2044. The structure is 240 ft (73.2 m) long and 60 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 SB (SR-93) over SR-876 (daniels Pkwy) built?
It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2010.
What condition is I-75 SB (SR-93) over SR-876 (daniels Pkwy) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does I-75 SB (SR-93) over SR-876 (daniels Pkwy) carry?
About 59,541 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is I-75 SB (SR-93) over SR-876 (daniels Pkwy)?
The structure is 240 ft (73.2 m) long with a longest span of 74 ft (22.5 m) and a deck 60 ft wide.
Who owns I-75 SB (SR-93) over SR-876 (daniels Pkwy)?
It is owned by the State Highway Agency.