US Bridges

Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD

Good

Lake County, Florida · 4.9 MI W of Wekiva Ri · Structure no. 110106

Built
2020
5 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,802 ft
18 main spans
Daily traffic
16,400
2024 count
Owner
State
State Highway Agency

About this bridge

Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD is a prestressed concrete stringer/multi-beam or girder carrying Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD in Lake County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,400 vehicles a day, roughly 19% of them trucks, projected to reach 28,563 by 2044. The structure is 1,802 ft (549.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWekiva Pkwy WB
CrossesWldlife Cross 1 & Omd RD
Location4.9 MI W of Wekiva Ri
StateFlorida
Coordinates28.81444, -81.49833
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans18
Design loadHL 93
Structure length1,802 ft (549.2 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,400 (2024)
Projected traffic28,563 by 2044
Trucks19%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD built?

It was built in 2020, making it 5 years old in 2025.

What condition is Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD carry?

About 16,400 vehicles per day (2024 count), of which roughly 19% are trucks.

How long is Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD?

The structure is 1,802 ft (549.2 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns Wekiva Pkwy WB over Wldlife Cross 1 & Omd RD?

It is owned by the State Highway Agency.