US Bridges

US231 SR75 over Stump Creek

Fair

Jackson County, Florida · 4.3MI South of I10 SR8 · Structure no. 530098

Built
1985
40 years old
Condition
Fair
inspected July 2024
Type
Slab
Prestressed Concrete
Length
105 ft
3 main spans
Daily traffic
6,000
2022 count
Owner
State
State Highway Agency

About this bridge

US231 SR75 over Stump Creek is a prestressed concrete slab carrying US231 SR75 over Stump Creek in Jackson County, Florida. It was built in 1985, so it is 40 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,000 vehicles a day, roughly 29% of them trucks, projected to reach 10,410 by 2044. The structure is 105 ft (32 m) long and 72 ft wide. If it were closed, the detour would be 26.7 mi (43 km).

CarriesUS231 SR75
CrossesStump Creek
Location4.3MI South of I10 SR8
RouteU.S. Route 231
StateFlorida
Coordinates30.6898, -85.39265
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating60 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length105 ft (32 m)
Longest span35 ft (10.7 m)
Deck width72 ft (21.9 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,000 (2022)
Projected traffic10,410 by 2044
Trucks29%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.7 mi (43 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US231 SR75 over Stump Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is US231 SR75 over Stump Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does US231 SR75 over Stump Creek carry?

About 6,000 vehicles per day (2022 count), of which roughly 29% are trucks.

How long is US231 SR75 over Stump Creek?

The structure is 105 ft (32 m) long with a longest span of 35 ft (10.7 m) and a deck 72 ft wide.

Who owns US231 SR75 over Stump Creek?

It is owned by the State Highway Agency.