109th Street over Park Lateral Canal
FairIndian River County, Florida · 0.3MI West of CR-507 · Structure no. 884064
- Built
- 1960
- 65 years old, rebuilt 1998
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 75 ft
- 5 main spans
- Daily traffic
- 101
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
109th Street over Park Lateral Canal is a concrete slab carrying 109th Street over Park Lateral Canal in Indian River County, Florida. It was built in 1960 and reconstructed in 1998, so it is 65 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 101 vehicles a day, roughly 2% of them trucks, projected to reach 126 by 2042. The structure is 75 ft (22.9 m) long and 21 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 109th Street over Park Lateral Canal built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1998.
What condition is 109th Street over Park Lateral Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does 109th Street over Park Lateral Canal carry?
About 101 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is 109th Street over Park Lateral Canal?
The structure is 75 ft (22.9 m) long with a longest span of 15 ft (4.6 m) and a deck 21 ft wide.
Who owns 109th Street over Park Lateral Canal?
It is owned by the County Highway Agency.