SR2 over Branch
GoodHolmes County, Florida · 4.0MI. W of SR79 · Structure no. 520095
- Built
- 1940
- 85 years old
- Condition
- Good
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 21 ft
- 2 main spans
- Daily traffic
- 1,700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR2 over Branch is a concrete culvert carrying SR2 over Branch in Holmes County, Florida. It was built in 1940, so it is 85 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,700 vehicles a day, roughly 21% of them trucks, projected to reach 2,950 by 2044. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 26.1 mi (42 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR2 over Branch built?
It was built in 1940, making it 85 years old in 2025.
What condition is SR2 over Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does SR2 over Branch carry?
About 1,700 vehicles per day (2022 count), of which roughly 21% are trucks.
How long is SR2 over Branch?
The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).
Who owns SR2 over Branch?
It is owned by the State Highway Agency.