US Bridges

Orient Road over Railroad

Good

Hillsborough County, Florida · 0.1MI North of SR-60 · Structure no. 105611

Built
1969
56 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
374 ft
6 main spans
Daily traffic
10,700
2024 count
Owner
County
County Highway Agency

About this bridge

Orient Road over Railroad is a prestressed concrete stringer/multi-beam or girder carrying Orient Road over Railroad in Hillsborough County, Florida. It was built in 1969, so it is 56 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,700 vehicles a day, roughly 10% of them trucks, projected to reach 13,375 by 2044. The structure is 374 ft (114 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesOrient Road
CrossesRailroad
Location0.1MI North of SR-60
RouteCounty Highway 0
StateFlorida
Coordinates27.95456, -82.3731
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.1 US tons
Inventory rating21.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length374 ft (114 m)
Longest span101 ft (30.8 m)
Deck width35 ft (10.6 m)
Roadway width33 ft (10 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,700 (2024)
Projected traffic13,375 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Orient Road over Railroad built?

It was built in 1969, making it 56 years old in 2025.

What condition is Orient Road over Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Orient Road over Railroad carry?

About 10,700 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Orient Road over Railroad?

The structure is 374 ft (114 m) long with a longest span of 101 ft (30.8 m) and a deck 35 ft wide.

Who owns Orient Road over Railroad?

It is owned by the County Highway Agency.