US Bridges

Citrus Park Drive over Drainage Pipe X7

Good

Hillsborough County, Florida · 1.06MI E/O Cntryway Blvd · Structure no. 104486

Built
2022
3 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
42 ft
7 main spans
Daily traffic
30,500
2024 count
Owner
County
County Highway Agency

About this bridge

Citrus Park Drive over Drainage Pipe X7 is a concrete culvert carrying Citrus Park Drive over Drainage Pipe X7 in Hillsborough County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,500 vehicles a day, roughly 5% of them trucks, projected to reach 38,125 by 2046. The structure is 42 ft (12.8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCitrus Park Drive
CrossesDrainage Pipe X7
Location1.06MI E/O Cntryway Blvd
RouteCity Street 0
StateFlorida
Coordinates28.06511, -82.60861
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating49.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans7
Design loadHL 93
Structure length42 ft (12.8 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,500 (2024)
Projected traffic38,125 by 2046
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Citrus Park Drive over Drainage Pipe X7 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Citrus Park Drive over Drainage Pipe X7 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Citrus Park Drive over Drainage Pipe X7 carry?

About 30,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Citrus Park Drive over Drainage Pipe X7?

The structure is 42 ft (12.8 m) long with a longest span of 6 ft (1.8 m).

Who owns Citrus Park Drive over Drainage Pipe X7?

It is owned by the County Highway Agency.