Viaduct Ramp E over 7th Avenue (CR-574)
GoodHillsborough County, Florida · 0.3 MI S of I-4 WB · Structure no. 100724
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,005 ft
- 7 main spans
- Daily traffic
- 9,250
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Viaduct Ramp E over 7th Avenue (CR-574) is a prestressed concrete stringer/multi-beam or girder carrying Viaduct Ramp E over 7th Avenue (CR-574) in Hillsborough County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,250 vehicles a day, roughly 11% of them trucks, projected to reach 16,049 by 2042. The structure is 1,005 ft (306.3 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Viaduct Ramp E over 7th Avenue (CR-574) built?
It was built in 2013, making it 12 years old in 2025.
What condition is Viaduct Ramp E over 7th Avenue (CR-574) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Viaduct Ramp E over 7th Avenue (CR-574) carry?
About 9,250 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is Viaduct Ramp E over 7th Avenue (CR-574)?
The structure is 1,005 ft (306.3 m) long with a longest span of 147 ft (44.7 m) and a deck 45 ft wide.
Who owns Viaduct Ramp E over 7th Avenue (CR-574)?
It is owned by the State Toll Authority and maintained by the State Highway Agency.