US Bridges

Kingsway Road over I-4 (SR-400)

Good

Hillsborough County, Florida · 0.4 Mile N of US-92 · Structure no. 100613

Built
1997
28 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
347 ft
2 main spans
Daily traffic
3,900
2023 count
Owner
State
State Highway Agency

About this bridge

Kingsway Road over I-4 (SR-400) is a steel continuous stringer/multi-beam or girder carrying Kingsway Road over I-4 (SR-400) in Hillsborough County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 5% of them trucks, projected to reach 4,875 by 2042. The structure is 347 ft (105.7 m) long and 47 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesKingsway Road
CrossesI-4 (SR-400)
Location0.4 Mile N of US-92
RouteCounty Highway 0
StateFlorida
Coordinates28.01239, -82.27776
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.1 US tons
Inventory rating43.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length347 ft (105.7 m)
Longest span174 ft (52.9 m)
Deck width47 ft (14.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2023)
Projected traffic4,875 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kingsway Road over I-4 (SR-400) built?

It was built in 1997, making it 28 years old in 2025.

What condition is Kingsway Road over I-4 (SR-400) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Kingsway Road over I-4 (SR-400) carry?

About 3,900 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Kingsway Road over I-4 (SR-400)?

The structure is 347 ft (105.7 m) long with a longest span of 174 ft (52.9 m) and a deck 47 ft wide.

Who owns Kingsway Road over I-4 (SR-400)?

It is owned by the State Highway Agency.