US Bridges

I-4 EB to I-75 SB over US-92 (SR-600)

Good

Hillsborough County, Florida · 0.4MI S of I-4 (SR-400) · Structure no. 100424

Built
1983
42 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
189 ft
3 main spans
Daily traffic
16,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-4 EB to I-75 SB over US-92 (SR-600) is a prestressed concrete stringer/multi-beam or girder carrying I-4 EB to I-75 SB over US-92 (SR-600) in Hillsborough County, Florida. It was built in 1983, so it is 42 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,500 vehicles a day, roughly 9% of them trucks, projected to reach 20,625 by 2042. The structure is 189 ft (57.7 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-4 EB to I-75 SB
CrossesUS-92 (SR-600)
Location0.4MI S of I-4 (SR-400)
RouteInterstate 75
StateFlorida
Coordinates27.99706, -82.32705
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating61.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20 + Mod
Structure length189 ft (57.7 m)
Longest span107 ft (32.5 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,500 (2023)
Projected traffic20,625 by 2042
Trucks9%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 EB to I-75 SB over US-92 (SR-600) built?

It was built in 1983, making it 42 years old in 2025.

What condition is I-4 EB to I-75 SB over US-92 (SR-600) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-4 EB to I-75 SB over US-92 (SR-600) carry?

About 16,500 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-4 EB to I-75 SB over US-92 (SR-600)?

The structure is 189 ft (57.7 m) long with a longest span of 107 ft (32.5 m) and a deck 31 ft wide.

Who owns I-4 EB to I-75 SB over US-92 (SR-600)?

It is owned by the State Highway Agency.