US Bridges

I-75 NB over I-4 and Ramp C-1

Good

Hillsborough County, Florida · I-75 & I-4 Interchange · Structure no. 100394

Built
1984
41 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
476 ft
6 main spans
Daily traffic
83,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-75 NB over I-4 and Ramp C-1 is a prestressed concrete stringer/multi-beam or girder carrying I-75 NB over I-4 and Ramp C-1 in Hillsborough County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 83,500 vehicles a day, roughly 11% of them trucks, projected to reach 144,872 by 2042. The structure is 476 ft (145 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-75 NB
CrossesI-4 and Ramp C-1
LocationI-75 & I-4 Interchange
RouteInterstate 75
StateFlorida
Coordinates28.0021, -82.32692
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54 US tons
Inventory rating48 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length476 ft (145 m)
Longest span101 ft (30.8 m)
Deck width60 ft (18.3 m)
Roadway width56 ft (17.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic83,500 (2023)
Projected traffic144,872 by 2042
Trucks11%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 NB over I-4 and Ramp C-1 built?

It was built in 1984, making it 41 years old in 2025.

What condition is I-75 NB over I-4 and Ramp C-1 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-75 NB over I-4 and Ramp C-1 carry?

About 83,500 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is I-75 NB over I-4 and Ramp C-1?

The structure is 476 ft (145 m) long with a longest span of 101 ft (30.8 m) and a deck 60 ft wide.

Who owns I-75 NB over I-4 and Ramp C-1?

It is owned by the State Highway Agency.