US Bridges

I-75 SB (SR-93A) over Fletcher Ave. (CR-582A)

Good

Hillsborough County, Florida · 1MI North of SR-582 · Structure no. 100391

Built
1983
42 years old, rebuilt 2013
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
221 ft
4 main spans
Daily traffic
64,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-75 SB (SR-93A) over Fletcher Ave. (CR-582A) is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93A) over Fletcher Ave. (CR-582A) in Hillsborough County, Florida. It was built in 1983 and reconstructed in 2013, so it is 42 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 64,500 vehicles a day, roughly 15% of them trucks, projected to reach 111,908 by 2042. The structure is 221 ft (67.4 m) long and 70 ft wide.

CarriesI-75 SB (SR-93A)
CrossesFletcher Ave. (CR-582A)
Location1MI North of SR-582
RouteInterstate 75
StateFlorida
Coordinates28.06991, -82.35409
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating36.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length221 ft (67.4 m)
Longest span80 ft (24.3 m)
Deck width70 ft (21.3 m)
Roadway width67 ft (20.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic64,500 (2023)
Projected traffic111,908 by 2042
Trucks15%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 SB (SR-93A) over Fletcher Ave. (CR-582A) built?

It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2013.

What condition is I-75 SB (SR-93A) over Fletcher Ave. (CR-582A) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I-75 SB (SR-93A) over Fletcher Ave. (CR-582A) carry?

About 64,500 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is I-75 SB (SR-93A) over Fletcher Ave. (CR-582A)?

The structure is 221 ft (67.4 m) long with a longest span of 80 ft (24.3 m) and a deck 70 ft wide.

Who owns I-75 SB (SR-93A) over Fletcher Ave. (CR-582A)?

It is owned by the State Highway Agency.