CR676A Progress Bd over I-75 (SR-93)
FairHillsborough County, Florida · 0.6MI West of US-301 · Structure no. 100381
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 359 ft
- 2 main spans
- Daily traffic
- 14,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
CR676A Progress Bd over I-75 (SR-93) is a steel continuous stringer/multi-beam or girder carrying CR676A Progress Bd over I-75 (SR-93) in Hillsborough County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,600 vehicles a day, roughly 13% of them trucks, projected to reach 25,331 by 2042. The structure is 359 ft (109.4 m) long and 47 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR676A Progress Bd over I-75 (SR-93) built?
It was built in 1984, making it 41 years old in 2025.
What condition is CR676A Progress Bd over I-75 (SR-93) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does CR676A Progress Bd over I-75 (SR-93) carry?
About 14,600 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is CR676A Progress Bd over I-75 (SR-93)?
The structure is 359 ft (109.4 m) long with a longest span of 180 ft (54.9 m) and a deck 47 ft wide.
Who owns CR676A Progress Bd over I-75 (SR-93)?
It is owned by the State Highway Agency.