SR618 Selmon EB over Macdill & Bay to Bay Blv
FairHillsborough County, Florida · 1.9MI E/O Gandy Blvd. · Structure no. 100315
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 809 ft
- 2 main spans
- Daily traffic
- 24,500
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR618 Selmon EB over Macdill & Bay to Bay Blv is a steel continuous stringer/multi-beam or girder carrying SR618 Selmon EB over Macdill & Bay to Bay Blv in Hillsborough County, Florida. It was built in 1976, so it is 49 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,500 vehicles a day, roughly 7% of them trucks, projected to reach 42,508 by 2044. The structure is 809 ft (246.7 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR618 Selmon EB over Macdill & Bay to Bay Blv built?
It was built in 1976, making it 49 years old in 2025.
What condition is SR618 Selmon EB over Macdill & Bay to Bay Blv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does SR618 Selmon EB over Macdill & Bay to Bay Blv carry?
About 24,500 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is SR618 Selmon EB over Macdill & Bay to Bay Blv?
The structure is 809 ft (246.7 m) long with a longest span of 139 ft (42.4 m) and a deck 40 ft wide.
Who owns SR618 Selmon EB over Macdill & Bay to Bay Blv?
It is owned by the State Toll Authority.