US Bridges

I-275 NB over Central & Henderson Ave

Good

Hillsborough County, Florida · 0.4MI S I-4/ I-275 Intchg · Structure no. 100140

Built
1963
62 years old, rebuilt 2006
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
432 ft
8 main spans
Daily traffic
118,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-275 NB over Central & Henderson Ave is a prestressed concrete stringer/multi-beam or girder carrying I-275 NB over Central & Henderson Ave in Hillsborough County, Florida. It was built in 1963 and reconstructed in 2006, so it is 62 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 118,000 vehicles a day, roughly 7% of them trucks, projected to reach 204,730 by 2044. The structure is 432 ft (131.7 m) long and 98 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-275 NB
CrossesCentral & Henderson Ave
Location0.4MI S I-4/ I-275 Intchg
RouteInterstate 275
StateFlorida
Coordinates27.95863, -82.45497
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating42.8 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length432 ft (131.7 m)
Longest span103 ft (31.3 m)
Deck width98 ft (29.9 m)
Roadway width92 ft (28.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic118,000 (2024)
Projected traffic204,730 by 2044
Trucks7%
Lanes on structure7
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-275 NB over Central & Henderson Ave built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2006.

What condition is I-275 NB over Central & Henderson Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does I-275 NB over Central & Henderson Ave carry?

About 118,000 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is I-275 NB over Central & Henderson Ave?

The structure is 432 ft (131.7 m) long with a longest span of 103 ft (31.3 m) and a deck 98 ft wide.

Who owns I-275 NB over Central & Henderson Ave?

It is owned by the State Highway Agency.