US Bridges

CR-17 over Josephine Creek

Good

Highlands County, Florida · 3.8MI South of US-98 · Structure no. 090047

Built
1982
43 years old
Condition
Good
inspected June 2024
Type
Slab
Prestressed Concrete
Length
210 ft
7 main spans
Daily traffic
550
2024 count
Owner
County
County Highway Agency

About this bridge

CR-17 over Josephine Creek is a prestressed concrete slab carrying CR-17 over Josephine Creek in Highlands County, Florida. It was built in 1982, so it is 43 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, roughly 11% of them trucks, projected to reach 954 by 2044. The structure is 210 ft (64 m) long and 43 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCR-17
CrossesJosephine Creek
Location3.8MI South of US-98
RouteCounty Highway 17
StateFlorida
Coordinates27.37412, -81.39344
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.9 US tons
Inventory rating35.3 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans7
Design loadUnknown
Structure length210 ft (64 m)
Longest span30 ft (9.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2024)
Projected traffic954 by 2044
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR-17 over Josephine Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is CR-17 over Josephine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does CR-17 over Josephine Creek carry?

About 550 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is CR-17 over Josephine Creek?

The structure is 210 ft (64 m) long with a longest span of 30 ft (9.1 m) and a deck 43 ft wide.

Who owns CR-17 over Josephine Creek?

It is owned by the County Highway Agency.