US Bridges

CR-78 over Austin Relief Canal

Good

Hendry County, Florida · 2 Miles East of CR-78A · Structure no. 074029

Built
1997
28 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
64 ft
3 main spans
Daily traffic
1,080
2021 count
Owner
County
County Highway Agency

About this bridge

CR-78 over Austin Relief Canal is a concrete culvert carrying CR-78 over Austin Relief Canal in Hendry County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,080 vehicles a day, roughly 5% of them trucks, projected to reach 1,350 by 2041. The structure is 64 ft (19.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR-78
CrossesAustin Relief Canal
Location2 Miles East of CR-78A
RouteCounty Highway 78
StateFlorida
Coordinates26.75337, -81.48206
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.2 US tons
Inventory rating28.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length64 ft (19.6 m)
Longest span22 ft (6.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,080 (2021)
Projected traffic1,350 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR-78 over Austin Relief Canal built?

It was built in 1997, making it 28 years old in 2025.

What condition is CR-78 over Austin Relief Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does CR-78 over Austin Relief Canal carry?

About 1,080 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is CR-78 over Austin Relief Canal?

The structure is 64 ft (19.6 m) long with a longest span of 22 ft (6.7 m).

Who owns CR-78 over Austin Relief Canal?

It is owned by the County Highway Agency.