US Bridges

SR-80 over US-27

Good

Hendry County, Florida · 2.9 MI E/O CR-833 · Structure no. 070081

Built
2013
12 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
196 ft
2 main spans
Daily traffic
8,300
2022 count
Owner
State
State Highway Agency

About this bridge

SR-80 over US-27 is a prestressed concrete stringer/multi-beam or girder carrying SR-80 over US-27 in Hendry County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,300 vehicles a day, roughly 22% of them trucks, projected to reach 14,400 by 2044. The structure is 196 ft (59.7 m) long and 53 ft wide. If it were closed, the detour would be 23 mi (37 km).

CarriesSR-80
CrossesUS-27
Location2.9 MI E/O CR-833
RouteState Highway 80
StateFlorida
Coordinates26.75444, -81.08167
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating40.3 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length196 ft (59.7 m)
Longest span98 ft (29.9 m)
Deck width53 ft (16.2 m)
Roadway width51 ft (15.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic8,300 (2022)
Projected traffic14,400 by 2044
Trucks22%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed23 mi (37 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-80 over US-27 built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR-80 over US-27 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR-80 over US-27 carry?

About 8,300 vehicles per day (2022 count), of which roughly 22% are trucks.

How long is SR-80 over US-27?

The structure is 196 ft (59.7 m) long with a longest span of 98 ft (29.9 m) and a deck 53 ft wide.

Who owns SR-80 over US-27?

It is owned by the State Highway Agency.