US Bridges

CR-832 over Industrial Canal

Good

Hendry County, Florida · 2.0 Miles West of US-27 · Structure no. 070054

Built
1976
49 years old
Condition
Good
inspected June 2023
Type
Slab
Concrete Continuous
Length
150 ft
5 main spans
Daily traffic
4,228
2021 count
Owner
County
County Highway Agency

About this bridge

CR-832 over Industrial Canal is a concrete continuous slab carrying CR-832 over Industrial Canal in Hendry County, Florida. It was built in 1976, so it is 49 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,228 vehicles a day, roughly 10% of them trucks, projected to reach 7,262 by 2041. The structure is 150 ft (45.7 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR-832
CrossesIndustrial Canal
Location2.0 Miles West of US-27
RouteCounty Highway 832
StateFlorida
Coordinates26.73987, -80.91892
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.9 US tons
Inventory rating32.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span31 ft (9.3 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,228 (2021)
Projected traffic7,262 by 2041
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR-832 over Industrial Canal built?

It was built in 1976, making it 49 years old in 2025.

What condition is CR-832 over Industrial Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does CR-832 over Industrial Canal carry?

About 4,228 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is CR-832 over Industrial Canal?

The structure is 150 ft (45.7 m) long with a longest span of 31 ft (9.3 m) and a deck 42 ft wide.

Who owns CR-832 over Industrial Canal?

It is owned by the County Highway Agency.