I10 SR8 over Ochlockonee Relief
FairGadsden County, Florida · 1.0 MI West of Leon Cty. · Structure no. 500055
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 650 ft
- 13 main spans
- Daily traffic
- 21,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I10 SR8 over Ochlockonee Relief is a prestressed concrete stringer/multi-beam or girder carrying I10 SR8 over Ochlockonee Relief in Gadsden County, Florida. It was built in 1972, so it is 53 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,500 vehicles a day, roughly 24% of them trucks, projected to reach 37,302 by 2044. The structure is 650 ft (198.1 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I10 SR8 over Ochlockonee Relief built?
It was built in 1972, making it 53 years old in 2025.
What condition is I10 SR8 over Ochlockonee Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I10 SR8 over Ochlockonee Relief carry?
About 21,500 vehicles per day (2022 count), of which roughly 24% are trucks.
How long is I10 SR8 over Ochlockonee Relief?
The structure is 650 ft (198.1 m) long with a longest span of 50 ft (15.2 m) and a deck 43 ft wide.
Who owns I10 SR8 over Ochlockonee Relief?
It is owned by the State Highway Agency.