US Bridges

SR65 over Graham Creek

Good

Franklin County, Florida · 13.2MI N of SR30 US98 · Structure no. 490036

Built
2021
4 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
3 main spans
Daily traffic
1,898
2022 count
Owner
State
State Highway Agency

About this bridge

SR65 over Graham Creek is a prestressed concrete stringer/multi-beam or girder carrying SR65 over Graham Creek in Franklin County, Florida. It was built in 2021, so it is 4 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,898 vehicles a day, roughly 16% of them trucks, projected to reach 3,293 by 2044. The structure is 180 ft (54.9 m) long and 47 ft wide. If it were closed, the detour would be 26.1 mi (42 km).

CarriesSR65
CrossesGraham Creek
Location13.2MI N of SR30 US98
RouteState Highway 65
StateFlorida
Coordinates29.85388, -84.9731
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.2 US tons
Inventory rating43.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length180 ft (54.9 m)
Longest span60 ft (18.3 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,898 (2022)
Projected traffic3,293 by 2044
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.1 mi (42 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR65 over Graham Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is SR65 over Graham Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR65 over Graham Creek carry?

About 1,898 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is SR65 over Graham Creek?

The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 47 ft wide.

Who owns SR65 over Graham Creek?

It is owned by the State Highway Agency.