CR184 over Escambia River Relief
FairEscambia County, Florida · 0.5MI E of Rocky Branch R · Structure no. 480044
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 792 ft
- 22 main spans
- Daily traffic
- 5,700
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CR184 over Escambia River Relief is a prestressed concrete stringer/multi-beam or girder carrying CR184 over Escambia River Relief in Escambia County, Florida. It was built in 1957, so it is 68 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,700 vehicles a day, roughly 14% of them trucks, projected to reach 9,890 by 2042. The structure is 792 ft (241.4 m) long and 34 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR184 over Escambia River Relief built?
It was built in 1957, making it 68 years old in 2025.
What condition is CR184 over Escambia River Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does CR184 over Escambia River Relief carry?
About 5,700 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is CR184 over Escambia River Relief?
The structure is 792 ft (241.4 m) long with a longest span of 36 ft (11 m) and a deck 34 ft wide.
Who owns CR184 over Escambia River Relief?
It is owned by the County Highway Agency.