US29 SR95 over Canoe Creek
GoodEscambia County, Florida · 13.5MI North of SR97 · Structure no. 480013
- Built
- 1958
- 67 years old, rebuilt 1988
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 216 ft
- 6 main spans
- Daily traffic
- 4,076
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US29 SR95 over Canoe Creek is a prestressed concrete stringer/multi-beam or girder carrying US29 SR95 over Canoe Creek in Escambia County, Florida. It was built in 1958 and reconstructed in 1988, so it is 67 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,076 vehicles a day, roughly 15% of them trucks, projected to reach 7,072 by 2044. The structure is 216 ft (65.8 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US29 SR95 over Canoe Creek built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1988.
What condition is US29 SR95 over Canoe Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does US29 SR95 over Canoe Creek carry?
About 4,076 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is US29 SR95 over Canoe Creek?
The structure is 216 ft (65.8 m) long with a longest span of 36 ft (11 m) and a deck 43 ft wide.
Who owns US29 SR95 over Canoe Creek?
It is owned by the State Highway Agency.