Confederate Pt RD over Butcher Pin Creek
FairPosted for loadDuval County, Florida · 0.2 MI E of Blanding Blvd · Structure no. 724088
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 144 ft
- 4 main spans
- Daily traffic
- 9,641
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Confederate Pt RD over Butcher Pin Creek is a prestressed concrete slab carrying Confederate Pt RD over Butcher Pin Creek in Duval County, Florida. It was built in 1970, so it is 55 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 9,641 vehicles a day, roughly 2% of them trucks, projected to reach 16,727 by 2042. The structure is 144 ft (43.9 m) long and 38 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Confederate Pt RD over Butcher Pin Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Confederate Pt RD over Butcher Pin Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Confederate Pt RD over Butcher Pin Creek carry?
About 9,641 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Confederate Pt RD over Butcher Pin Creek?
The structure is 144 ft (43.9 m) long with a longest span of 36 ft (11 m) and a deck 38 ft wide.
Who owns Confederate Pt RD over Butcher Pin Creek?
It is owned by the City or Municipal Highway Agency.